Why Coordinating Exterior Projects Matters
Renovating piecemeal usually costs more and risks damage. Painting siding before replacing the roof is a recipe for disaster (scuffed paint from ladders). Installing gutters before the roof often means they have to be removed and re-hung.
Sequencing Best Practices (The Golden Order)
- Roof & Skylights: The “hat” goes on first. This is the messiest job. Get it done and watertight.
- Windows & Doors: Install these next so the flashing can be integrated into the wall properly before siding.
- Siding & Trim: Goes on after windows to cover the window nailing fins and flashing tape, creating a perfect seal.
- Gutters & Downspouts: Installed last, attached to the new fascia/roof edge.
- Paint & Landscaping: The finishing touches once heavy construction is gone.
Cost Efficiencies & Labor Savings
Hiring a single contractor like Blue Peaks to manage the “Full Envelope” saves money on:
– Permits: Often combined into one.
– Waste: One dumpster for all debris.
– Scaffolding: Set up once for roof, siding, and windows.
Risk Reduction & Quality Control
When one company handles the roof-to-wall intersection, there is no finger-pointing if a leak occurs. We own the warranty for the entire system.